Project Name
: Hammar De_Gassing StationOur Client
: PETROJECT (For SAMSUNG)Job Duration
: Oct 20th, 2015 – June 13th, 2016Job Details
1- Tanks foundations with diameter of 52 meter
2- Equipment foundations
3- Concrete Water Trenches
4- Store House with dimension of (32 meter * 9 meter)
5- Earth works within the site area that included removing existing soil and replaced with layers of subbase material
Project Name
: West Qurna-2 Oil FieldOur Client
: ALAMCO (For SAMSUNG)Job Duration
: May 12th, 2016 – Sept 05th, 2017Job Details
1- Pipe Rack Foundations within the Flare area
2- Earth works within the site area that included removing existing soil and replaced with layers of subbase material
Project Name
: Siba Gas FieldOur Client
: PETROJET (For Kuwait Energy)Job Duration
: March 08th, 2017 – Nov 12th, 2019Job Details
1- Administration building in the Kuwait Energy camp
2- Site workshops
3- Equipment foundations
4- Earth works within the site area that included removing existing soil and replaced with layers of subbase material.
Project Name
: Alikhlas School Project (Aldear-Basrah)Our Client
: Aldhafir Co. (For Ministry of Education)Job Duration
: May 20th, 2017 – Feb 12th, 2018Job Details
24 classes -school
Project Name
: Hammer Mushrif De-Gassing StationOur Client
: Handasat Madenaty (For Albilal Co.)Job Duration
: Jan 24th, 2019 – March 15th, 2020Job Details
1- Tanks foundations (Including excavation works)
2- Pipe Rack Foundations (Including excavation works)
3- Earth works within the site area that included removing existing soil and replaced with layers of subbase material.
Project Name
: Zubair Power Plant (PPG)Our Client
: 1. Shams Alsabah (For GE) - 2. Power Engineering World (For GE)Job Duration
: July 20th, 2016 – Dec 15th, 2021Job Details
1- Pipe Rack foundations
2- Fuel Oil Pump Station (Civil works only)
3- Sewage Treatment Plant (Civil works only)
4- FO Unloading Station (Civil works only)
5- First Gate House (Civil works only)
6- Raw Water Pump Shed (Civil works only)
7- Irrigation Sump (Civil works only)
8- Fire Fighting Foam Production Skid (Civil works only)
9- External Gate House (Civil works only)
10- Security Building (Civil works only)
11- All Internal Asphalt roads
12- External Asphalt Road with length of (5000 meter)
13- Several finishing works for different types of buildings inside the power plant including painting works, gypsum plastering works, installation of doors and windows, and false ceiling installation works
14- Supply and installation of T-wall for GE camp with a length of (1500 meter) and a height of (3.6 meter)
Supply and install HESCO Barrier for a length of (5000 meter)
Watching Tower (4 No.)
Project Name
: Butaira 132-33 KV SubstationOur Client
: Shams Al-Sabah (For Siemens Energy)Job Duration
: Sept 15th, 2020 – PresentJob Details
1- Excavation and Filling works
2- Civil works of the main building
3- Civil works of transformer area
4- Civil works of foundation of gantry and outdoor equipment
5- Civil works of Water Supply System, Sewage System, and Rainwater System
6- Civil works of Guard House
7- Internal Roads
8- Foundations of Capacitors and AUX. Transformers
9- Boundary Wall & Watching towers
10- Car Parking and BRC fence installation around the Switchyard area
Project Name
: Umm Qasr Industrial Complex (Quay No.4)Our Client
: Sama Almanar (For General Company for Ports of Iraq)Job Duration
: Sept. 1st 2021 - PresentJob Details
1- Earth filling works (clean soil and subbase material) including dynamic compaction works
2- Flat storage (4 No.) with dimension of 114 meter * 23 meter and height of 10 meter
3- Water tanks (2 No.) with dimension of 40 meter * 26 meter
4- Power station building
5- Guard house building
6- Workshop building