1- Hammar Degassing Station

  • Project Name

    : Hammar De_Gassing Station
  • Our Client

    : PETROJECT (For SAMSUNG)
  • Job Duration

    : Oct 20th, 2015 – June 13th, 2016

Job Details

1- Tanks foundations with diameter of 52 meter

2- Equipment foundations

3- Concrete Water Trenches

4- Store House with dimension of (32 meter * 9 meter)

5- Earth works within the site area that included removing existing soil and replaced with layers of subbase material

Agent Image

2- West Qurna-2 Oil Field

  • Project Name

    : West Qurna-2 Oil Field
  • Our Client

    : ALAMCO (For SAMSUNG)
  • Job Duration

    : May 12th, 2016 – Sept 05th, 2017

Job Details

1- Pipe Rack Foundations within the Flare area

2- Earth works within the site area that included removing existing soil and replaced with layers of subbase material

Agent Image

3- Siba Gas Field

  • Project Name

    : Siba Gas Field
  • Our Client

    : PETROJET (For Kuwait Energy)
  • Job Duration

    : March 08th, 2017 – Nov 12th, 2019

Job Details

1- Administration building in the Kuwait Energy camp

2- Site workshops

3- Equipment foundations

4- Earth works within the site area that included removing existing soil and replaced with layers of subbase material.

Agent Image

4- Alikhlas School Project (Alder-Basrah)

  • Project Name

    : Alikhlas School Project (Aldear-Basrah)
  • Our Client

    : Aldhafir Co. (For Ministry of Education)
  • Job Duration

    : May 20th, 2017 – Feb 12th, 2018

Job Details

24 classes -school

Agent Image

5- Hammar Mushrif De-Gassing Station

  • Project Name

    : Hammer Mushrif De-Gassing Station
  • Our Client

    : Handasat Madenaty (For Albilal Co.)
  • Job Duration

    : Jan 24th, 2019 – March 15th, 2020

Job Details

1- Tanks foundations (Including excavation works)

2- Pipe Rack Foundations (Including excavation works)

3- Earth works within the site area that included removing existing soil and replaced with layers of subbase material.

Agent Image

6- Zubair Power Plant (PPG)

  • Project Name

    : Zubair Power Plant (PPG)
  • Our Client

    : 1. Shams Alsabah (For GE) - 2. Power Engineering World (For GE)
  • Job Duration

    : July 20th, 2016 – Dec 15th, 2021

Job Details

1- Pipe Rack foundations

2- Fuel Oil Pump Station (Civil works only)

3- Sewage Treatment Plant (Civil works only)

4- FO Unloading Station (Civil works only)

5- First Gate House (Civil works only)

6- Raw Water Pump Shed (Civil works only)

7- Irrigation Sump (Civil works only)

8- Fire Fighting Foam Production Skid (Civil works only)

9- External Gate House (Civil works only)

10- Security Building (Civil works only)

11- All Internal Asphalt roads

12- External Asphalt Road with length of (5000 meter)

13- Several finishing works for different types of buildings inside the power plant including painting works, gypsum plastering works, installation of doors and windows, and false ceiling installation works

14- Supply and installation of T-wall for GE camp with a length of (1500 meter) and a height of (3.6 meter)

Supply and install HESCO Barrier for a length of (5000 meter)

Watching Tower (4 No.)

Agent Image

7- Butaira 132-33 KV Substation

  • Project Name

    : Butaira 132-33 KV Substation
  • Our Client

    : Shams Al-Sabah (For Siemens Energy)
  • Job Duration

    : Sept 15th, 2020 – Present

Job Details

1- Excavation and Filling works

2- Civil works of the main building

3- Civil works of transformer area

4- Civil works of foundation of gantry and outdoor equipment

5- Civil works of Water Supply System, Sewage System, and Rainwater System

6- Civil works of Guard House

7- Internal Roads

8- Foundations of Capacitors and AUX. Transformers

9- Boundary Wall & Watching towers

10- Car Parking and BRC fence installation around the Switchyard area

Agent Image

8- UmM Qasr Industrial Complex (Quay No.4)

  • Project Name

    : Umm Qasr Industrial Complex (Quay No.4)
  • Our Client

    : Sama Almanar (For General Company for Ports of Iraq)
  • Job Duration

    : Sept. 1st 2021 - Present

Job Details

1- Earth filling works (clean soil and subbase material) including dynamic compaction works

2- Flat storage (4 No.) with dimension of 114 meter * 23 meter and height of 10 meter

3- Water tanks (2 No.) with dimension of 40 meter * 26 meter

4- Power station building

5- Guard house building

6- Workshop building